SAP C_TS422_1909 Exam Dumps - PDF Questions and Testing Engine
Latest C_TS422_1909 Exam Dumps for Pass Guaranteed
SAP C_TS422_1909 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Capacity Planning in SAP S/4HANA 8% - 12% | Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics. |
| Introduction to SAP S/4HANA Production Planning < 8% | Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning. |
| Process Orders in SAP S/4HANA < 8% | Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP). |
| Lean Manufacturing in SAP S/4HANA 8% - 12% | Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. |
| Master Data in SAP S/4HANA > 12% | Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version. |
NEW QUESTION 27
Which SAP solutions are part of the Digital Value Network portfolio?
There are 3 correct answers to this question.
Response:
- A. SAP Hybris
- B. SAP Human Capital Management
- C. Concur
- D. SAP Visual Enterprise
- E. SAP Fieldglass
Answer: A,C,E
NEW QUESTION 28
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?
- A. Planning with final assembly (40)
- B. Make-to-order production (20)
- C. Make-to-stock production (10)
- D. Planning without final assembly (50)
Answer: A
NEW QUESTION 29
In which customizing activity do you set up automatic routing selection for production orders?
Please choose the correct answer.
Response:
- A. Define order-type-dependent parameter
- B. Define scheduling parameters for production orders
- C. Define production scheduling profile
- D. Define selection profiles
Answer: A
NEW QUESTION 30
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
- A. Consumption-based planning
- B. Manual planning without check
- C. Forecast planning
- D. Material requirements planning
Answer: A
NEW QUESTION 31
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR?
There are 2 correct answers to this question.
Response:
- A. Scheduling margin key
- B. Production scheduling profile
- C. Confirmation profile
- D. Operation control key
Answer: B,D
NEW QUESTION 32
Which of these are layers in SAP Best Practice content?
There are 3 correct answers to this question.
Response:
- A. Solution packages
- B. Configuration guides
- C. Process diagrams
- D. Building blocks
- E. Scope items
Answer: A,D,E
NEW QUESTION 33
Where can you maintain consumption mode and consumption periods for planning strategies?
There are 2 correct answers to this question.
Response:
- A. In the requirements class
- B. In the material master
- C. In the plant parameters
- D. In the MRP group
Answer: B,D
NEW QUESTION 34
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?
- A. Top of Red
- B. Top of Yellow
- C. Top of Red Base
- D. Top of Green
Answer: D
NEW QUESTION 35
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings?
Please choose the correct answer.
Response:
- A. Plant Settings -> MRP Group -> Material Master
- B. MRP Group -> Material Master -> Plant Settings
- C. Material Master -> MRP Group -> Plant Settings
- D. Material Master -> Plant Settings -> MRP Group
Answer: C
NEW QUESTION 36
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?
- A. It is converted into a production order.
- B. It is converted into a schedule line.
- C. It is converted into a planned order.
- D. It is converted into a reservation.
Answer: D
NEW QUESTION 37
Which times are used for Basic Date Scheduling of manufacturing planned orders in MRP?
There are 2 correct answers to this question.
Response:
- A. Float before and float after production
- B. Opening period
- C. Goods receipt processing time
- D. Setup time
Answer: A,D
NEW QUESTION 38
What is the correct sequence of the following Activate methodology phases?
Please choose the correct answer.
Response:
- A. Validate, Realize, Test , Deploy
- B. Prepare, Realize, Iterate, Continuous Improvement
- C. Prepare, Explore, Realize, Deploy
- D. Prepare, Validate, Test, Go-Live
Answer: C
NEW QUESTION 39
Which capabilities does the Alert monitor have?
There are 3 correct answers to this question.
Response:
- A. Automatically send alerts with Alert Notification Engine
- B. Nominate time-dependent substitutes for a planner
- C. Automatically reschedule in case of overload alerts
- D. Automatically predict alerts in future planning cycles
- E. Generate alerts based on defined threshold values
Answer: A,B,E
NEW QUESTION 40
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?
Response:
- A. Finite resource and finite strategy
- B. Infinite resource and infinite strategy
- C. Infinite resource and finite strategy
- D. Finite resource and infinite strategy
Answer: A
NEW QUESTION 41
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.
- A. Reduce the planning window.
- B. Form optimum sequences to reduce setup times.
- C. Select an alternative mode on a resource.
- D. Execute a new production planning run.
- E. Adjust the available capacity.
Answer: B,C,E
NEW QUESTION 42
What is a work center hierarchy in SAP S/4HANA capacity planning?
- A. A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel
- B. A group of work centers in a production line being used in sequence for production
- C. A group of alternative work centers providing a cumulative available capacity for production
- D. A group of alternative work centers for production, structured in hierarchy levels by prior ties
Answer: C
NEW QUESTION 43
Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.
- A. Capacity Requirements Planning (CRP)
- B. Integrated Business Planning (IBP)
- C. Material Requirements Planning (MRP)
- D. Supply Chain Management (SCM)
Answer: B,D
NEW QUESTION 44
When do you use variant bills of materials (BOMB)?
- A. When multiple material also have the same BOM
- B. When a material has multiple BOMB
- C. When a material has a configurable BOM
- D. When multiple material is have similar BOMB
Answer: A
NEW QUESTION 45
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: There are 2 correct answers to this question.
- A. Checking rule and group must be assigned.
- B. PRT Availability check must be set.
- C. Indicator Relevant for finite scheduling must be set.
- D. Checking control must have an overall profile assigned in customizing.
Answer: C,D
NEW QUESTION 46
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.
- A. The Change Planning Direct on indicator is set.
- B. The work center has several individual capacities.
- C. Alternative resources are fully occupied.
- D. The planning strategy is infinite.
Answer: B,D
NEW QUESTION 47
What capabilities does SAP S/4HANA embedded analytics provide?
There are 2 correct answers to this question.
Response:
- A. Automatic update of story boards
- B. Real time decision support
- C. Strategic analysis
- D. Comparison of current data with historical data to identify trends
Answer: B,C
NEW QUESTION 48
......