NEW QUESTION # 36
What is the focus of repetitive manufacturing?
- A. Period and quantity-oriented production
- B. Detailed tracking of production orders
- C. Production of lot size one
- D. Low volume production
Answer: A
NEW QUESTION # 37
What are some benefits of planning with planned independent requirements for finished materials?
Note: There are 2 correct answers to this question.
- A. You have the option to use forecast planning.
- B. The delivery time is reduced.
- C. You have the option to use make-to-order production.
- D. Manufacturing time for final assembly is reduced.
Answer: A,C
NEW QUESTION # 38
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from dependent requirements? Note: There are 2 correct answers to this question.
- A. In-house production time
- B. Planned delivery time
- C. Operation duration
- D. Total replenishment lead time
Answer: A,B
NEW QUESTION # 39
How would you define a pegging structure for an order in the context of Advanced Planning?
- A. An evaluation that is ordered according to the low-level codes of all related products and represents the coverage of issue elements with receipt elements and stock
- B. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between receipt and issue elements
- C. An evaluation to identify overstock situations based on the assignment of receipt and issue elements after the production planning run
- D. An evaluation to identify material or capacity shortages in the bill-of-material structure after the production planning run
Answer: B
NEW QUESTION # 40
Which objects can you change with a change number?
Note: There are 2 correct answers to this question.
- A. Production order
- B. Routings
- C. Work center
- D. Bill of material
Answer: B,D
NEW QUESTION # 41
How can you limit the validity of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. By material status
- B. By plant
- C. By change number
- D. By material type
Answer: B,D
NEW QUESTION # 42
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision?
Note: There are 3 correct answers to this question.
- A. Planned orders are created in MRP with reference to sales orders.
- B. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.
- C. Production and procurement costs are managed on the sales order item level.
- D. Storage location MRP areas are required to manage sales-order-specific stock.
- E. Net requirements calculation is carried out for every sales order individually.
Answer: A,C,E
NEW QUESTION # 43
Which alternative item strategies are available in bills of material (BOMs)?
Note: There are 2 correct answers to this question.
- A. Simultaneous
- B. Ranking
- C. Manual maintenance
- D. 100% check
Answer: C,D
NEW QUESTION # 44
Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program.
Which planning strategy do you use?
- A. Planning with final assembly (40)
- B. Assembly processing with production orders (82)
- C. Planning without final assembly (50)
- D. Make-to-stock production (10)
Answer: D
NEW QUESTION # 45
In SAP documentation for MRP in Advanced Planning, you read that the MRP creates new planned orders through infinite scheduling. What does this mean for the capacity requirements of the new planned order?
- A. MRP automatically assigns the capacity requirements to resources with the earliest available capacity.
- B. MRP automatically assigns the capacity requirements after the last scheduled operation for each resource.
- C. MRP creates the capacity requirements on resources at the earliest possible production time.
- D. MRP creates the capacity requirements without considering existing load on the resources.
Answer: D
NEW QUESTION # 46
What happens when you set up detailed scheduling with the finite scheduling mode Insert Operation?
- A. An operation is scheduled as close as possible to the desired date.
- B. Sequencing on multi-activity resources is automatically updated during planning.
- C. Operations on multi-resources are planned finitely in a sequence.
- D. To create a slot, neighbouring operations are moved in both planning directions.
Answer: A
NEW QUESTION # 47
You use the Finite Scheduling - with Reverse planning strategy and want to allow scheduling in the past.
How can you parameterize this in the strategy profile?
- A. Specify a negative PP/DS horizon
- B. Specify a negative offset time
- C. Specify a negative planning horizon
- D. Specify a negative opening period
Answer: B
NEW QUESTION # 48
Which settings can you make in a production scheduling profile?
Note: There are 3 correct answers to this question.
- A. Automatic goods receipt on confirmation
- B. Default order types
- C. Automatic goods issue on confirmation
- D. Automatic print on order creation
- E. Automatic release on order creation
Answer: A,B,E
NEW QUESTION # 49
When does the system trigger replenishment for a Kanban container?
- A. When you set the container to In transit
- B. When you set the container to Waiting
- C. When you set the container to Empty
- D. When you set the container to Full
Answer: C
NEW QUESTION # 50
Which time elements are relevant for lead time scheduling of a production order?
Note: There are 2 correct answers to this question.
- A. Float after production
- B. Opening period
- C. Setup time
- D. Total replenishment lead time
Answer: A,C
NEW QUESTION # 51
......